Crew-rated and autonomous platforms, plus the consumables and spares programs that keep them mission-capable. Every catalog item is qualified to Mars Rover Supply's MRS-9100 environmental specification — dust ingress, thermal cycling, and radiation tolerance characterized end-to-end before it leaves Tharsis Yard.

Manned platforms

Carriage Class. 4-crew pressurized rover for 14-day surface excursions. Argon-cycle ECLSS, 38 kWh photovoltaic + RTG hybrid power train, 6×6 articulated chassis tested over 11,000 km of analog terrain at the Atacama Long-Range Facility.

Cartwright Heavy. 8-crew long-range pressurized rover. Designed for a 90-day continuous operations envelope with field-replaceable life-support cassettes. First delivery to Artemis Base Camp logistics partners projected Q4 2027.

Autonomous platforms

Scout-7 Survey. Solar-electric autonomous rover for prospecting and site characterization. Modular instrument bay accepts LIBS, ground-penetrating radar, and neutron spectrometer payloads. 30 km/sol nominal range on Mars insolation.

Haulmaster-21. Autonomous cargo rover with 2,100 kg payload capacity. Tele-op fallback, autonomous convoy formation, and modular trailer interface for surface logistics at established bases.

Consumables & spares

ECLSS cassettes, drive-train assemblies, photovoltaic blankets, suit-interface seals, and the full MRS-spec consumables catalog. Forward-deployed via the Tharsis Yard logistics partnership; standard fulfillment SLA is 38 sols to surface from order confirmation.